Projects

Spring 2015:
-Replace the front hatch - DONE
-Replace the salon hatch - DONE
-Upgrade the navigation station/panel - DONE
-Create propane tank compartment for new oven - DONE
-Varnishing the exterior teak - In Progress
-Replace outside and inside speakers - DONE
-Replace lights in salon - DONE
-Fix stanchion on port side of boat - DONE
-Added larger cleats to bow - DONE

Summer 2015:
-Move all electrical  over to the navigation panel and rewire boat - DONE (Completed Spring 2016)
-Move GPS and put on a swinging arm - DONE
-Install new oven - DONE
-Making the inside hatches look pretty - DONE
-Install water filter - DONE
-Polish all wood inside the boat - DONE (Completed Spring 2016)
-Make covers for both new hatches
-Make bug nets for hatches and companion way - In Progress (2 done 1 more to go)
-Make covers for winches
-Make fitted sheets for VBerth - DONE
-Replace water pump - DONE

Winter 2015/Spring 2016:
-Put on anchor winless and bow roller - DONE
-Purchase dinghy - DONE
-Install new battery monitor, bildge monitor and waste tank monitor - DONE
-Install 2 new air dorades - DONE
-Compounded and polished outside of boat - DONE
-Paint bottom of boat - DONE
-Upgraded batteries - DONE
-Upgraded all navigation lights to LED - DONE
-Installed radar - DONE
-Rewired mast and reconfigured mast wiring through deck - DONE
-Added larger mid-shift cleats - DONE

Winter 2016/Spring 2017:
-Replace motor and change system from gas to diesel
-Replace countertops in galley, table in salon and desk top at navigation station

Possible Future Projects:
-Remove hot water heater
-VBerth forward port light
-Re-paint deck
-Attach a swim ladder to boat

Completed  Big Projects from Previous Seasons:
-Replace front 6 port lights
-Wet sanding and compounding the hull
-Electrical work